Sealants: The Added Link in Prevention
Course Number: 673
Course Contents
Procedures for Pit and Fissure Sealant Placement
Procedures for pit and fissure sealant placement may vary based on type of sealant and manufacturer. Referring to the manufacturer’s instructions is recommended before proceeding.
Tray Set Up
Prior to the start of the procedure, a tray with all necessary instruments, supplies, and equipment should be prepared. The items listed below are included in the sample tray set-up (Figure 6). Each operator needs to determine what should be included on the tray based on personal preferences and the sealant material being used.
Figure 6. Tray set-up.
Mirror Explorer (No. 5) Cotton Pliers Isolation Device such as cotton rolls or other substitutes | Saliva ejector Syringe Tip Slow Speed Handpiece Toothbrush | Material Directions Curing Light Articulating Paper |
The following pages will outline procedural steps for resin-based sealants and glass ionomer cement sealants.
0/16Next